Objective

Isolate the effect of expected system utilization on the Tensordyne calculator’s estimates. This exercise compares 50% with 75%, keeping the model, hardware and every other operating assumption constant.

Bounded fictional example: a team wants to understand this single variation before extending its analysis. No numerical outcome is assumed; you will record only the values actually displayed.

Requirements

Locate Model Selection, Hardware Selection and Operating Parameters. Documented parameters include Expected System Utilization, rack power in kW, Energy Cost per kWh, depreciation and PUE (total data-center energy divided by IT equipment energy).

Prepare your own note table with columns for parameter or metric, unit, 50% scenario and 75% scenario. Inspect the assumptions before changing anything.

Steps

Run a single-variable comparison. If you cannot identify a parameter or keep it constant, stop interpreting the comparison rather than filling gaps with assumptions.

  1. Select and record a supported model and hardware combination, for example Llama 3 70B - MLPerf® and Nvidia DGX H200. For each metric, use the same column (reference hardware or Tensordyne) at both utilization levels. Also record rack power, energy cost, depreciation, PUE and any other displayed operating assumptions.
  2. Check the units and meaning of the assumptions. In particular, distinguish power in kW from energy in kWh; preserve the initial values of every parameter other than utilization.
  3. Set Expected System Utilization to 50%. Verify that the model, hardware and other parameters still match your recorded baseline.
  4. Copy the displayed Total Tokens per Second, Cost per million total tokens and Total Tokens per kWh into your table, retaining their units and displayed precision.
  5. Change only Expected System Utilization to 75%. Check the constant parameters again before copying the same three metrics into the second scenario column.
  6. Compare each pair of values. If useful, calculate the difference between the 75% scenario and the 50% scenario without adding decimal precision unsupported by the display.
  7. If an output is missing, appears inconsistent or accompanies an unintended assumption change, recheck the parameters and repeat the comparison. If the problem persists, conclude that the comparison remains unusable.

Expected result

The target is a traceable comparison table showing how the three estimated metrics vary between the two utilization assumptions.

Keep your conclusion conditional: under the recorded assumptions, the calculator displays a particular difference, or no visible difference. Neither the direction nor the magnitude of a change is guaranteed.

Checks

Confirm that utilization is the only difference between columns. A change in model, hardware or energy cost prevents you from attributing the difference to that variable alone.

Check three distinctions: total throughput versus per-user throughput; production cost versus API price; simulation versus measured benchmark. Cost per million tokens here concerns total tokens.

If the values are identical at the displayed precision, record that finding without inventing a hidden effect.

Pitfalls to avoid

These educational estimates may be incorrect or outdated. The calculator uses normalized public performance data; Tensordyne 1 results come from simulations not verified by MLPerf.

This sensitivity exercise is not a quote, a measured benchmark or a promise of savings. It involves no API call, purchase, account creation or benchmark. Do not turn an estimate into purchasing advice.

Next steps

Keep the assumptions, units and outputs alongside your conditional conclusion. If you extend the analysis, define another question and vary only one assumption at a time.

Before making an economic decision, seek independent validation suited to your actual workload; this exercise serves only to explore the sensitivity of estimates.